Timaru Fuel Terminal
Ewing Construction were contracted to provide full Mechanical services for the new fuel terminal in Timaru.
The project consisted of four new fuel storage tanks, a slops tank and all associated supply and fire protection pipework.
To maximise thorough put on site, Ewing Construction pre-fabricated the bulk of the pipework at their facilities in Christchurch, supplying fully tested and painted pipe spools, reducing site fabrication and install times.
The site pipework, manifolds, wharf line and fire protection pipework was managed and resourced independently from the tank fabrication, with each team working in parallel to provide a streamlined timeframe for delivery of the entire terminal mechanical works.